Greenslade Reserve Stage 2 Underway
Work is well underway on Stage 2 of the Greenslade Reserve project which is designed to increase stormwater capacity to […]
www.johngillon.co.nz
Work is well underway on Stage 2 of the Greenslade Reserve project which is designed to increase stormwater capacity to […]
Work is due to begin soon on Stage 2 of the Greenslade Reserve stormwater project, which includes lowering the sportsfield […]
The Kaipatiki Local Board is presenting 4 movies in our parks this summer! Smallfoot is part of the Auckland-wide Movies […]
Attached are some of the slides from a presentation that the Kaipatiki Local Board received today on the plans for […]