Work continues on Sunnybrae Road to install the T2 transit lane, move bus stops, change carparks, and other changes that were consulted on in 2020. Be aware that there is a road closure overnight from 7pm to 5am until Friday 10 June. 🚧
Please see the attached design drawings that incorporate changes from the consultation.
What isn’t shown on the drawings are the two sets of transit lane cameras that have been installed. 📸 These are the same design as on Onewa Road, with 4 cameras per pole, and are designed to monitor the number of people in each vehicle during the T2 period. I have requested information from AT on when the cameras will be active and whether there will be a warning period before infringement notices are issued.
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/20220602_143607.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/20220602_143458.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/20220602_143745.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/updated-plans-public-consultation-style_Page_3.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/updated-plans-public-consultation-style_Page_2.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/updated-plans-public-consultation-style_Page_4.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/updated-plans-public-consultation-style_Page_6.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/updated-plans-public-consultation-style_Page_5.jpg)
![](https://www.johngillon.co.nz/wp-content/uploads/2022/06/updated-plans-public-consultation-style_Page_1.jpg)