Work is now underway to reseal the portion of Stanley Road between Embassy Place and Peach Road with asphalt.
The work is scheduled to take place overnight tonight and tomorrow night (17-18 May 2021) from 7pm to 5am.

Road resurfacing work involves removing the existing surface layer, applying a sealing coat, a new asphalt surface layer and line marking to the finished road surface.

Please see the attached map and information from the leaflet that should have gone to surrounding properties.

Leave a Reply

Your email address will not be published. Required fields are marked *